Source: Virginia Department of Transportation, Midtown Tunnel from the Norfolk side (2007), until 2016, Midtown Tunnel traffic squeezed into just one lane in each direction The towns of Dighton and Berkley paid a bridge tender to open the bridge as needed. A section of the original bridge was left on the Newport News side to serve as a fishing pier.8, the James River Bridge can lift a section of the roadway vertically up to 145 feet high Source: Virginia Department of Transportation, Elizabeth River Tunnels Project (by Tom Saunders). A life preserver or PFD is formally referred to as a Personal Device. Click on: http://www.regulations.gov/#!documentDetail;D=USCG-2012-0357-0001 Select the blue box to make comments. Coleman Bridge on US-17 On US-17 at the Coleman Bridge there are no scheduled bridge openings at this time. Example video title will go here for this video. The commission's independence reflects the concerns in the 1950's that travelers would not pay enough toll revenue to cover all costs, and the desire of the General Assembly to insulate the state from the financial risk. Source: Virginia Department of Transportation, Monitor-Merrimac Memorial Bridge-Tunnel, a second tunnel was added at Midtown Tunnel in 2016, so bi-directional traffic now occurs only during repairs The Clergy Patrol was suspended in 2020 because of the pandemic but Dr. Antipas Harris, founder of the Urban Renewal Center, said he recently called on interim Police Chief Michael Goldsmith to restore the program as crime is on the increase. The contract guaranteed an average annual profit of 13.5 percent, with annual increases up to 3.5%. Bridge opening schedules for marine traffic are as follows: Flagler Memorial Bridge. The James River Bridge has carried Route 17 between Newport News and Isle of Wight County since 1928. Vehicles on I-264 going from Portsmouth to downtown Norfolk travel first underneath the Southern Branch of the Elizabeth River via the Downtown Tunnel, then take the Berkley Bridge across the Eastern Branch of the Elizabeth River. looking towards Norfolk across the Berkley Bridge, from eastern portal of Downtown Tunnel Source: Virginia Department of Transportation, Downtown Tunnel and the Berkley Bridge east of the Southern Branch of the Elizabeth River The first underwater tunnel constructed for vehicles in Virginia was the Downtown Tunnel underneath the Elizabeth River, connecting . The I-264 Berkley Bridge will open for maritime vessel signal at 9 a.m., 11 a.m., 1 p.m., and 2:30 p.m., Monday through Friday. The tunnels of the Chesapeake Bay Bridge-Tunnel allow ships drawing 55' of water to cross, offering the greatest depth for a navigable channel. Federal Law Title 33, Part 177 Draw Bridge Operations ) gives marine traffic the right-of-way over vehicular traffic. . After placement over the trench excavated in the river bottom, water ballast tanks in each segment were flooded enough to sink the segment into place. If you've ever traveled to or from downtown Norfolk, you've probably crossed the Berkley Bridge. [3].mw-parser-output .attached-kml-error{color:#d33}.mw-parser-output .attached-kml-error code{font-size:inherit;font-weight:normal;border:0}.mw-parser-output .kmldata,.mw-parser-output .attached-kml-wikidata{display:none}Route map: .mw-parser-output .side-box{margin:4px 0;box-sizing:border-box;border:1px solid #aaa;font-size:88%;line-height:1.25em;background-color:#f9f9f9;display:flow-root}.mw-parser-output .side-box-abovebelow,.mw-parser-output .side-box-text{padding:0.25em 0.9em}.mw-parser-output .side-box-image{padding:2px 0 2px 0.9em;text-align:center}.mw-parser-output .side-box-imageright{padding:2px 0.9em 2px 0;text-align:center}@media(min-width:500px){.mw-parser-output .side-box-flex{display:flex;align-items:center}.mw-parser-output .side-box-text{flex:1}}@media(min-width:720px){.mw-parser-output .side-box{width:238px}.mw-parser-output .side-box-right{clear:right;float:right;margin-left:1em}.mw-parser-output .side-box-left{margin-right:1em}}. Berkley Bridge is a drawbridge. The service, sponsored by the Burlington County Bridge Commission, notifies customers of the Tacony-Palmyra and Burlington-Bristol Bridges of scheduled bridge openings and other traffic issues. How many underwater tunnels are in Virginia? 2020. . Is there a tunnel in Virginia that goes underwater? BRIDGE OPENING: Berkley Bridge extended opening today at 1:30 PM Several tug boats will steer a 600-foot long, 140-foot wide floating dry dock which is bound for Colonna's Shipyard in Norfolk. URL links are allowed only if they inform the content no advertising your business or blog. Search It carries I-64 between the cities of Hampton and Virginia Beach. Governor Terry McAuliffe was clear in his opinion of the contract negotiated by Gov. Traction tires are usually marked with a mountain/snowflake symbol, the letters M+S or All Season.. Berkeley student and software startup founder, Amrita Bhasin, breaks barriers as a tech entrepreneur. Bridge lifts will continue to be restricted during rush hours, from 5 a.m. to 9 a.m. and from 3 p.m. to 7 p.m. During those hours, only commercial ships with drafts of 18 feet or more can request an opening. The toll relief program could save low-income residents as much as $650/year in toll payments. The Bridge-Tunnel project is a four-lane 20-mile-long vehicular toll crossing of the lower Chesapeake Bay. The bridge will not open during these scheduled times when vessels have not signaled and are not waiting for passage. In 1991, during an expansion of I-264, the Downtown Tunnel was expanded to four lanes and a parallel Berkley Bridge was built, bringing the total Berkley Bridge capacity to eight lanes. How many underwater tunnels are in Virginia? The duration of the traffic stops due to the bridge lifts are dependent on maritime traffic volumes. Crews are currently in the process of installing ducts and threading steel . DriveERT Weekly Lane Closure Schedule Feb. 24 - March 3 . Starting today, drivers can time their trips to avoid traffic delays from Berkley Bridge openings on weekdays. The longest bridge in the world over waterIt is approximately five miles long. . The Fall 2021 bridge lift schedule is as follows: Wednesday, Sept. 29 at 9:30 a.m. Saturday Oct. 2 at 9 a.m. Wednesday, Oct. 6 at 9:30 a.m. Saturday, Oct. 9 at 9 a.m. Wednesday, Oct.13 at 9:30 a.m. Saturday, Oct. 16 at 9 a.m. Wednesday, Oct. 20 at 9:30 a.m. Saturday, Oct. 23 at 9 a.m. Wednesday, Oct. 27 at 9:30 a.m. Saturday, Oct. 30 at 9 a.m. It hired a new Chief Executive Officer who altered how debts were collected and negotiated settlements. U.S. Coast Guard local notices to mariners. There will be no office hours for the Planning Board from February 8 thru March 1, 2023. TEL. A local disability rights advocacy group is pushing for changes in the Norfolk landscape after people with disabilities voiced concern about navigating the city. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. To ease traffic congestion at one of the area's most notorious chokepoints, the Berkley Bridge will open on a set schedule starting later this month instead of at the demand of ship. Trumbull Corporation was awarded a $59.8 million contract in October 2020 to build the four-lane US 522 bypass around Berkeley Springs, from just south of Berkeley Springs to WV 9. Here's your bridge lift schedule for today: **Berkley Bridge: Lifts can take place anytime between 9:00-9:30 a. . Monitor-Merrimac Memorial Bridge-Tunnel was built as a four-lane structure and has never been expanded, nor has it ever charged a toll.7, the tunnel component of the Monitor-Merrimac Memorial Bridge-Tunnel is below the James River shipping channel, close to Newport News Much of the traffic on the South Branch of the Elizabeth River going underneath the structure consisted of small boats following the Intracoastal Waterway using the Dismal Swamp Canal or the Albemarle and Chesapeake Canal. Public pressure led to Elizabeth River Crossings and the Virginia Department of Transportation creating a "toll relief program" in 2016 for low-income Portsmouth and Norfolk residents (in 2021, those making $30,000 per year or less). Openings and travel conditions The I-264 Berkley Bridge will open for maritime vessel signal at 9 a.m., 11 a.m., 1 p.m., and 2:30 p.m., Monday through Friday. massena police reports / By thermos foogo straw bottle / February 15, 2022 / By thermos foogo straw bottle / February 15, 2022 Comments must describe commenter's personal experience hearsay reports will be rejected. Currently, the bridge routinely opens weekdays at 9 a.m., 11 a.m., 1 p.m., and 2:30 p.m. -take action and give your opinion here. On this Wikipedia the language links are at the top of the page across from the article title. The definition of a bridge-tunnel, is a facility where a bridge transitions into an underwater tunnel via a man-made portal island. Architecture, Interiors and Gardens. Call the bridge tender at 425-339-1701 or 425-231-5388 or VHF CH. After exiting the Downtown Tunnel, and while crossing the bridge, all traffic for I-264 East has to immediately merge right with the two lanes of bridge on-ramp traffic from I-464 traffic in order to continue on I-264 E, while SR 337 Alternate(Waterside Drive) and St. Paul Boulevard traffic has to merge left for the left exit. The project includes three bridges, three intersections and a new interchange with WV 9. The schedule and duration of openings will vary depending on weather conditions, harbor congestion and vessel size. Peter's Hall, East Bank Demerara, Guyana. For holidays opening requests must be made by 5 p.m. two working days (excluding Friday) before the intended opening. It will also open for vessels with a draft of 18-feet or more, provided a six hour advance notice has been given. We are away from the dock at 10:15am and make an opening at the Elizabeth City Bridge at 10:30am. Effective March 1, 2022, motorists will receive a payment notice via U.S. Mail if they proceed through a dedicated E-ZPass lane without a valid transponder at the Tacony-Palmyra or Burlington-Bristol bridges. US 522 currently carries about 13,400 vehicles a day, about 30 percent of them are trucks. What time is the Berkley Bridge opening today? The opening schedule in place has proved quite beneficial to motorists in Hampton Roads. ft. house located at 2617 Gilmerton Rd, Chesapeake, VA 23323 sold for $186,400 on Nov 25, 2020. Temporary bulkheads were installed on each side, then the tubes were floated to the Elizabeth River site. DISCLAIMER: Bridge heights and clearances are published from sources and records provided by various state and federal entities. The Westbound Midtown Tunnel, built in 2016, is deep enough for a 47' channel. However, the drawbridge may be opened any time on the weekend or federal holidays. I want to The new two lanes were funded primarily by the Federal government, as part of I-64 construction. It is separated from the roadway and is fenced in. Recognized as one of the seven engineering wonders of the modern world, the 17.6 mile Chesapeake Bay Bridge-Tunnel spans the mouth of the Chesapeake Bay and connects Virginias Eastern Shore with the mainland in Virginia Beach. "Berkley Bridge". During this time, the drawbridge will open to vessels requesting passage at 9 a.m., 11 a.m., 1 p.m., and 2:30 p.m., Monday through Friday, except federal holidays. read more. 511 Hampton Roads on Twitter: "Bridge Opening: on I-264 at Berkley Bridge in Norfolk. The facility is toll-free and is operated and maintained by the Virginia Department of Transportation (VDOT). This construction included a new interchange for Interstate 464 which connects the Berkley area with Interstate 64 in the independent city of Chesapeake. The state signed a 58-year contract with Elizabeth River Crossings, a multinational conglomerate formed by Macquarie, an Australian investment banking group, and the Swedish construction firm Skanska. Show more Show more 1:32 7:02 New 4:20 12-25-2022 Buffalo, NY Downtown rolling shots after incredible. According to police, the call for the crash came in around 2:20 p.m. at the intersection of Pavilion Place and Jefferson Avenue. There have been several incarnations of a Berkley Bridge. Source: Kevin Johns, Design and Construction of the Gilmerton Vertical Lift Bridge, Berkley Bridge is a double-leaf bascule bridge across the Eastern Branch of the Elizabeth River Tunnels also eliminate the operational costs of a drawbridge operator and regular maintenance of metal parts that get sprayed with saltwater on windy days, but the cost of a tunnel is far greater than the cost of a drawbridge. Residents could apply for the program and receive a 50% toll discount on up to five round-trips a week through the Downtown or Midtown tunnels. #13. Drawbridge openings for marine traffic are restricted on weekdays between 6 a.m. and 9 a.m. and between 3 p.m. and 6 p.m. approximately five miles If you continue to use this site we will assume that you are happy with it. Bridge openings are allowed at any time on the weekends and on all Federal holidays except Columbus Day. Source: Virginia Department of Transportation (VDOT), RTS_0866a (by Tom Saunders). How long does it take the Berkley bridge to open? The Chesapeake Bay Bridge-Tunnel (technically, the "Lucius J. Kellam, Jr. Bridge-Tunnel" since 1987) is operated by the Chesapeake Bay Bridge and Tunnel Commission, an agency created by the General Assembly in 1959. The venerable Humpback Bridge lays claim to being the oldest of Virginias remaining covered bridges. Berkley Bridge is a drawbridge. Scheduled openings of the drawbridge will begin a week sooner than expected. Capacity on Route 58 was doubled in 2016 when a second tunnel was completed, along with extension of the MLK Freeway in Portsmouth from London Boulevard to Interstate The private company rehabilitates the tunnels, adding cameras, better lighting, and ventilation fans. So, since the bridge is constant, Im going to satisfy the moving object.. Peter's Hall, East Bank Demerara, Guyana. Marine opening requests for Friday through Sunday must be given by 5 p.m. on the preceding Wednesday. Twin two-lane tunnels will be bored through the sediments west of the existing eastbound tunnel. Source: ESRI, ArcGIS Online. When appropriate, reviews are forwarded to businesses for response prior to being made public. Currently, thebridge willopen on signal at anytime for vessels carrying hazardous cargo. New Bedford/Fairhaven Bridge Schedule. At all other times, the bridge will operate as scheduled. The contractor responsible for the facility, Elizabeth River Crossings, says:4, the oldest two-lane tube of the Downtown Tunnel, built in 1952, is 10 years older than the oldest two-lane tube of the Midtown Tunnel across the Elizabeth River Comments must be understandable and clear enough to inform other boaters. Missile sirens, research resolve: Ukrainians at Berkeley reflect on a year at war. The Cavaliers trailed by 13 in the third quarter, but went on a 19-2 run to take the lead. For more information contact Bridge Administrator Gregory Waverly at (757) 398-6222 or email at waverly.w.gregory@uscg.mil. Waterway Guide is proud to be a sponsor of: Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Under Gov. Bridgehunter.com. Water depth, placement of on-location signage and other variables may impact published horizontal and vertical clearances. Why do girls pretend to have a boyfriend? Tunnels eliminate the need for interrupting traffic flow for a boat's passage, providing a 24-7 option for driving underneath a waterway. When the bonds were fully repaid, the tolls were removed. The temporary regulation, in place since Sept. 2010, allows VDOT to schedule weekday bridge lifts at the Berkley Bridge to vessels requesting passage at 9 a.m., 11 a.m., 1 p.m. and 2:30 p.m., Monday through Friday. 9:30AM . Potential Delays. Potential Delays. Heres more on the engineering marvel that is the Wilson Creek Bridge. Bridge across Elizabeth River in Norfolk Virginia, Car-bike collision on Norfolk's pedestrian access bridge adjacent to the Berkley bridge, "Chart of Norfolk Harbor and Elizabeth River", Template:Attached KML/Berkley Bridge (Virginia), "VDOT changes policy after bicyclist hit by vehicle on bridge", "BERKLEY BRIDGE ACCIDENT UNDER INVESTIGATION", "After crash, VDOT makes changes on bridge walkway", Transportation in the Hampton Roads Region, Newport News/Williamsburg International Airport, https://en.wikipedia.org/w/index.php?title=Berkley_Bridge_(Virginia)&oldid=1109661348, Movable bridges on the Interstate Highway System, Bridges of the United States Numbered Highway System, Buildings and structures in Norfolk, Virginia, Short description is different from Wikidata, Infobox mapframe without OSM relation ID on Wikidata, Creative Commons Attribution-ShareAlike License 3.0, This page was last edited on 11 September 2022, at 04:01. (ii) Open on signal at 9 a.m., 11 a.m., 1 p.m. and 2:30 p.m. After 6:15 PM, the bridge will open on-demand from marine traffic by calling the bridge keeper's office on marine channel 13. Please email any plans or submissions to: planningboard@berkleyma.us and we will get back to you as soon as possible. The Coleman Bridge was built as a 2-lane facility in 1952, and it connects the counties of York and Gloucester.George P. Coleman Bridge. E-ZPass customers save $1 off the cash toll rate ($4.00). Source: Hampton Roads Bridge-Tunnel Expansion Project, DBE/SWaM Opportunity Event (September 11, 2019). Region Nine residents receive black giant chicks to boost food production, income. The first two lanes of the Midtown Tunnel opened in 1962. It carries Interstate264 (I-264), U.S. Route460 Alternate (US460 Alt. Does the Coleman Bridge have any openings today? It . Monday to Friday, 6:30 - 9 a.m. and 2:30 - 6 p.m., excluding Federal holidays. The Agriculture Ministry through the Guyana Livestock Development Authority (GLDA) is moving apace with its agenda to provide a sustainable source. It is named for the former Town of Berkley that is now a part of the City of Norfolk. WSDOT works with the US Coast Guard to create reasonable restrictions on marine openings (for vessels under 5,000 gross tons) during peak travel times to ease congestion for drivers when possible. The commissioners are appointed by the governor. Source: Virginia Department of Transportation, Midtown Tunnel, Portsmouth side (2007), Virginia partnered with Elizabeth River Crossings, a private company, to build a parallel Midtown Tunnel and expand/maintain nearby roads Drawbridge openings for marine traffic are restricted on weekdays between 7:15 a.m. and 8:15 a.m. and between 4:15 p.m. and 5:15 p.m. It takes about three and a half minutes for the bridge span to lift entirely. Source: Virginia Department of Transportation, Gilmerton Bridge 2011, the modern Gilmerton Bridge, with vertical lift structure Lifts are left in the "up" position except when a train is nearing the crossing. All WB & all EB travel lanes closed. How long does it take to open and close the Coleman Bridge? The Interstate 264 Berkley Bridge is a double-leaf bascule bridge that crosses the Eastern Branch of the Elizabeth River in Norfolk, Virginia, United States. The Berkley Bridge opened in 1952 and is part of the I-264 Downtown Tunnel complex crossing the eastern branch of the Elizabeth River and connecting the South Hampton Roads cities of Portsmouth and Norfolk. Between 1957-76, drivers using the Hampton Roads Bridge-Tunnel paid a toll. For each bridge opening, traffic is stopped for an average of 12 to 15 minutes and stacks up about 1 miles on each side of the Downtown Tunnel, according to Virginia Department of Transportation estimates. Incident on I-264 at Berkley Bridge in Norfolk shuts down all westbound lanes, Get the Android Weather app from Google Play, Police searching for two endangered missing children, 16YO arrested after shooting in NC restaurant parking, Missing endangered 15-year-old in Newport News found, Newport News Public Schools hosts virtual job fair, Man charged with murder after bodies found in home, Do Not Sell or Share My Personal Information. looking towards Norfolk across the Berkley Bridge, from eastern portal of Downtown Tunnel Request an Opening. The 5th Coast Guard District commanderissued a temporary deviation Wednesday based on comments received following the first schedule change last October. Bridge Opening: on I-264 at Berkley Bridge in Norfolk. Can you get to Virginia Beach without any tunnels? looking upstream at the James River Bridge, from Newport News towards Isle of Wight County Call the bridge tender at 509-577-1910 at least two hours before the intended opening Monday through Thursday. Citizens may submit comments, identified by docket number (USCG-2012-0357) by using any of the following methods: e-mail, fax, postal mail or hand delivery. All EB & all WB travel lanes closed. Is the Berkley bridge opening today? The toll-free facility is one of only a small number of movable bridges on the Interstate Highway System, and is the first of two in the Hampton Roads region, predating the High Rise Bridge. There are no restrictions for marine traffic because the SR 529 Bridges are over a tidal estuary and critical freight route. The temporary changes began Wednesday and will last through September 3. Each of the 11 segments was carefully aligned in the trench so they could be sealed into a continuous tube. Railroad cars are still transported across the Chesapeake Bay on a specialized ferry. The captcha question was answered incorrectly. 'Based on comments received and the consultation between VDOT and the maritime community, the changes will benefit the community and provide a reasonable balance between maritime priority and road-based transportation,' said Waverly Gregory, bridge admistrator for the 5th Coast Guard District. All EB & all WB . https://www.wavy.com/news/local-news/newport-news/juvenile-dies-another-injured-following-multi-vehicle-crash-on-jefferson-ave-in-newport-news/. berkley bridge opening schedule today. The two Downtown Tunnel tubes, further south on the Elizabeth River, also provide just a 35' deep channel and constrain the size of ships that could reach Norfolk Naval Shipyard.9, the older (1962) section of the Downtown Tunnel permits just a 35' deep navigational channel, while the younger (2016) section would allow dredging a 47' deep channel It takes another five minutes to close it. We use cookies to ensure that we give you the best experience on our website. A Notice of Proposed Rule Making for a 3 . 2023 Waterway Guide Media LLC: All rights reserved. Coleman Bridge is a 3,750-foot-long double-swing-span bridge located in Yorktown, Virginia, and the bridge crosses the York River. 3 beds, 1 bath, 975 sq. The contract with Elizabeth River Crossings was for 58 years, but the tunnels are expected to be in service for another 100-120 years. Highways officials had long hoped to upgrade WV 522 to ease traffic . The closures will begin at 11 p.m. on Friday and end at 5 a.m. the following Monday. Average opening time 11 minutes, traffic delays may be longer SR 101 - Hoquiam River Bridges Location Hoquiam Restrictions on marine openings Many vessels are only able to navigate the river and sloughs during high tide so bridge openings are regulated by the timing of the tide. Source: Virginia Department of Transportation, Midtown Tunnel, Norfolk side (2007), Downtown Tunnel and the Berkley Bridge east of the Southern Branch of the Elizabeth River, Tunnel under the Elizabeth River, between Berkley and Norfolk, Virginia, Portsmouth entrance to Norfolk - Portsmouth, Virginia Tunnel, Impact Of Removal Of Tolls On Travel In Tidewater Virginia, Volume I- Hampton Roads Bridge-Tunnel, Design and Construction of the Gilmerton Vertical Lift Bridge, Hampton Roads Shipping Channels and Port Competition, Marking and Dredging Navigation Channels in Virginia, A Railroad-Related Site in Old Town Alexandria, http://www.virginiadot.org/travel/hro-tunnel-default.asp, https://www.driveert.com/#/about-facilities, https://pilotonline.com/news/local/transportation/article_3b8115c3-7b73-5ff8-afab-a5fe77e7b85b.html, http://www.virginiadot.org/projects/resources/TunnelFact_Sheet_080729.pdf, https://www.hrbtexpansion.org/documents/2019/dbe-swam/hrbt_expansion_project_presentation_dbe-swam_event_final_2019-09-11.pdf, http://www.virginiadot.org/vtrc/main/online_reports/pdf/78-r4.pdf, https://www.driveert.com/project-info/midtown-tunnel/, https://www.driveert.com/wp-content/uploads/2012/12/ERT_fastfacts_Midtown-Tunnel_070915.pdf, https://pilotonline.com/news/government/virginia/article_c548146e-5f6d-571c-a023-62659b19673b.html, https://pilotonline.com/news/local/transportation/getting-around/article_8c72f851-8542-5d9e-a766-d08fc970770f.html, https://pilotonline.com/news/local/transportation/article_8f50a240-e39c-11e8-b29e-1b71445b652a.html, https://www.pilotonline.com/news/transportation/vp-bz-erc-tunnel-sold-20201109-gqghaif3jrc4zgjlsmgd367txa-story.html, https://www.pilotonline.com/opinion/columns/vp-ed-column-koch-0420-20210419-fmpi5tbqjzf4bgm4w34277pbcm-story.html, https://www.wavy.com/traffic/downtown-tunnel-the-first-underwater-tunnel-in-virginia-celebrates-70-years/, https://www.virginiabusiness.com/article/va-expands-elizabeth-river-tunnels-toll-relief-program/, https://www.pilotonline.com/news/transportation/vp-nw-midtown-downtown-tunnel-toll-relief-20211115-7yvjurbbvnajhgp3o3bv2aapjq-story.html, https://www.virginiadot.org/travel/hro-tunnel-default.asp, https://www.pilotonline.com/ask/article_eef3f188-fe4b-11e8-b2b5-5bdd7768bec9.html, http://www.roadstothefuture.com/US17_JRB.html, https://www.fhwa.dot.gov/bridge/nbi/ascii.cfm, http://www.virginiadot.org/VDOT/Projects/Hampton_Roads/asset_upload_file562_44966.pdf, http://sp.bridges.transportation.org/Documents/2016%20PRESENTATIONS%20SCOBS%20Annual%20Meeting/T-8%20Glimerton%20Vertical%20Lift%20Bridge%20Replacement%20-%20Kevin%20Johns.pdf, From Feet to Space: Transportation in Virginia.